Skip to main content
Miscellanous
Sitemap
Contact
Search
Legal notice
Login
Natural Water Retention Measures
Main menu
Home
Implementing NWRM
The Practical Guide
Communication material
Synthesis documents
data & Inspire
Catalogue of NWRM
NWRM per sector
NWRM per benefits
Benefit tables
Case studies
Sources
New French case studies
Glossary
Relations graph
About NWRM project
About
the Project
the Partners
Regional networks
Baltic Sea Network
Forum
Workshop n°1
Workshop n°2
Danube Network
Forum
Workshop n°1
Workshop n°2
Mediterranean Network
Forum
Workshop n°1
Workshop n°2
Western Network
Forum
Workshop n°1
Workshop n°2
Project documents
Home
»
Case Study
»
Riparian forests along the Maritsa river, Bulgaria
Riparian forests along the Maritsa river, Bulgaria
General
National Id:
Bulgaria_08
Site name:
Maritsa river
Summary:
This project, restoration and conservation of riparian forests, ended in 2012 with the recovery of a long-term conservation of habitats and species in protected area "Reka Maritsa". It was carried out by the local authority of Dimitrovgrad municipality.
NUTS Code:
Южен централен (Yuzhen tsentralen)
RBD code:
BG3000
Transboundary:
0
Data provider:
REC
Source(s):
Case study:Restoration and conservation of riparian forests
Riparian and lowland mixed woodlands and longozes
NWRM(s) implemented in the case study:
Forest riparian buffers
Longitude:
25.63861
Latitude:
42.06527
Site information
Climate zone:
warm temperate dry
Mean rainfall:
525
Mean rainfall unit:
mm/year
Average temperature:
12,6000003814697
Mean evaportranspiration:
669
Mean evaportranspiration unit:
mm/year
Type:
Case Study Info
Light or indepth?:
Light
Average slope range:
7.3
Monitoring maintenance
Monitoring impacts effects:
0
Performance
Performance impact estimation method:
Unknown
Biophysical impacts
Water quality overall improvements:
N/A info
Soil quality overall soil improvements:
N/A info
Lessons, risks, implications...
Key lessons:
Planning of NWRMs in places with existing infrastructure (bridges, roads, sand pits) need coordination with respective institutions in early phase and following strrictly the approval procedures in order to avoid risks for implementation. Detailed geodesic surveys are necessary during the technical design phase.
Success factor(s):
Financing:
Type
Comments
Other
Operative program: Environment 2007-2013
Barrier:
Driver:
Financing share:
Socio-economic
Costs total:
851000
Ecosystem improved biodiversity:
1
Information on Ecosystem improved biodiversity:
Improvement of habitats and populations of fish species subject to protection
Ecosystem impact climate regulation:
No information available
Policy, general governance and design targets
Policy pressure:
Policy requirement directive:
Policy impact:
Policy wider plan:
Policy area:
Policy target:
Target purpose
Pollutants Removal
Improved Biodiversity
Oher Societal Benefits
Design & implementations
Application scale:
River
Installation date:
2012-02
Design contractual arrangement:
Design consultation activity:
Design land use change:
Design authority:
Authority type
Role
Responsibility
Name
Comments
Local water authority
Initiation of the measure
Dimitrovgrad municipality
Administrative unit ???
National water authority
Financing
OP Environment 2007-2013
Ministry of environmental and water - Bulgaria
Log in
to post comments
Last updated: 12 Jan 2015 |