Skip to main content
Home
Toggle menu
  • NWRM
    • NWRM per sector
    • Access by benefits
  • Case studies
    • Case studies
    • Sources
  • Benefit tables
  • Glossary
  • About the project & Resources
    • History of the project
    • Historical partners
    • Project documents
    • data & Inspire

Assessing the impact of mire restoration on agricultural productivity: An interim progress report

Year
2014
Abstract
Report on the initial results of analysis of sward quality and parasites of re-wetting comparing sites with blocked and unblocked drainage ditches
Authors
Guy Freeman and Jamie Stevens
Case study(ies)
Exmoor Mires peatland restoration, UK
Source type
Project Report
URL
http://www.upstreamthinking.org/media.cfm?mediaid=7449

Funded by EU
Service contract funded by the European Commission((Directorate General Environment))
Pilot Project - Atmospheric Precipitation - Protection and efficient use of Fresh Water, Integration of Natural Water Retention Measures in River basin management

This website is managed by Office International de l’Eau | Join the NWRM group on Join us in Linked In

© Copyright NWRM 2013-2024

Contact Legal notice Log in
sfy39587stp18