Year of Issue
2024
General
National Id
IT_05
Site name
Cherio river basin
Summary
The Cherio River basin is located in the eastern part of Bergamo province, Lombardy region. It extends from the pre-alpine reliefs to the irrigated plain area, down to the confluence of Cherio River into Oglio River. The catchment area is about 153 km2, broken down mainly into forest (42%) and agricultural (39%) land. The territory is vulnerable to overflows and flooding events, which requires constant reclamation activities. Moreover, the increasing water withdrawals from Cherio River for industrial and agricultural purposes compromises the possibility to ensure environmental flows, especially during summer and drought periods. Pollution from nitrogen, phosphorus and wastewaters finally contributes to deteriorate the overall water quality.
OPTAIN seeks the involvement of local actors to identify strategies and solutions for an efficient water management, aimed at ensuring quali-quantitative standards to safeguard natural and aquatic habitats and to support an agricultural system deeply dependent on water resources.
OPTAIN seeks the involvement of local actors to identify strategies and solutions for an efficient water management, aimed at ensuring quali-quantitative standards to safeguard natural and aquatic habitats and to support an agricultural system deeply dependent on water resources.
Project
Optain
Light or indepth?
Light
The in-depth description of the case study
Transboundary
0
NWRM(s) implemented in the case study
Longitude
9.90888
Latitude
45.74249
Site information
Mean annual rainfall
600 - 900 mm
Monitoring maintenance
Monitoring impacts effects
0
Design & implementations
Public consultation
0
Contractural arrangements
0
Design contractual arrangement
Arrangement type | Responsibility | Role | Comments | Name |
---|---|---|---|---|
Design consultation activity
Activity stage | Key issues | Name | Comments |
---|---|---|---|
Design land use change
Land use change type |
---|
Design authority
Authority type | Role | Responsibility | Name | Comments |
---|---|---|---|---|
Lessons, risks, implications...
Financing mechanism
0
Success factor(s)
Success factor type | Success factor role | Comments |
---|---|---|
Financing
Financing type | Comments |
---|---|
Driver
Driver type | Driver role | Comments |
---|---|---|
Financing share
Financing share type | Share | Comments | |
---|---|---|---|
Policy, general governance and design targets
Policy description
There has been an increase in severe droughts and extreme rainfall events, leading to floods in both urban and agricultural areas. The area is also suffering from pollution of both urban and agricultural origin.
The project is being implemented in coordination with the following stakeholders: Regional government, the local reclamation board, and local farmers.
The project is being implemented in coordination with the following stakeholders: Regional government, the local reclamation board, and local farmers.
Part of wider plan
0
Policy target
Target purpose |
---|
Pollutants Removal
|
Peak-flow reduction
|
Erosion Control
|
Policy pressure
Pressure directive | Relevant pressure |
---|---|
Policy area
Policy area type | Policy area focus | Name | Comments |
---|---|---|---|
Policy impact
Impact directive | Relevant impact |
---|---|
Policy wider plan
Wider plan type | Wider plan focus | Name | Comments |
---|---|---|---|
Policy requirement directive
Requirement directive | Specification |
---|---|
Photo gallery