Year of Issue
2024
General
National Id
HU_07
Site name
Csorsza, Hungary
Summary
The Csorsza case study is located in Veszprém County, Hungary. The size of the study site is 21.3 km2, where 29% of the total catchment area is forest, 29% orchards and vineyards, 17% shrubs, 13% is arable land, 6% is grassland, and 5% is urban.
Some selected analysis are performed at the Felső-Válicka catchment, too. The Felső-Válicka study site is located in Zala County, flows in south-north direction into the River Zala. The size of the catchment is 131 km2. 27% of the total catchment area is forest, 35% is cropland, 11% is grassland, 3% is wetland and 11% is urban.
Both study sites are located in the catchment of Lake Balaton, therefore state of the environment and nature in these small catchments influences the touristic and economic potential of the Balaton region. Their water and nutrient management affects water quantity and quality of the lake. Extreme weather events will increase the environmental and social conflicts in the region.
Main challenges identified in both sites are decreasing soil erosion and nutrient load, preventing flash floods, and implementing integrated water resources conservation.
OPTAIN project aims to identify effective combination of the NSWRMs and optimize their allocation, in order to improve water and nutrient retention in the soil and the catchments. Emphasis will be put on suitable options to foster the resilience of agricultural production to climate change.
Some selected analysis are performed at the Felső-Válicka catchment, too. The Felső-Válicka study site is located in Zala County, flows in south-north direction into the River Zala. The size of the catchment is 131 km2. 27% of the total catchment area is forest, 35% is cropland, 11% is grassland, 3% is wetland and 11% is urban.
Both study sites are located in the catchment of Lake Balaton, therefore state of the environment and nature in these small catchments influences the touristic and economic potential of the Balaton region. Their water and nutrient management affects water quantity and quality of the lake. Extreme weather events will increase the environmental and social conflicts in the region.
Main challenges identified in both sites are decreasing soil erosion and nutrient load, preventing flash floods, and implementing integrated water resources conservation.
OPTAIN project aims to identify effective combination of the NSWRMs and optimize their allocation, in order to improve water and nutrient retention in the soil and the catchments. Emphasis will be put on suitable options to foster the resilience of agricultural production to climate change.
Project
Optain
Light or indepth?
Light
The in-depth description of the case study
Transboundary
0
NWRM(s) implemented in the case study
Optain's measures
Longitude
17.67489
Latitude
46.90908
Monitoring maintenance
Monitoring impacts effects
0
Design & implementations
Public consultation
0
Contractural arrangements
0
Design contractual arrangement
Arrangement type | Responsibility | Role | Comments | Name |
---|---|---|---|---|
Design consultation activity
Activity stage | Key issues | Name | Comments |
---|---|---|---|
Design land use change
Land use change type |
---|
Design authority
Authority type | Role | Responsibility | Name | Comments |
---|---|---|---|---|
Lessons, risks, implications...
Financing mechanism
0
Success factor(s)
Success factor type | Success factor role | Comments |
---|---|---|
Financing
Financing type | Comments |
---|---|
Driver
Driver type | Driver role | Comments |
---|---|---|
Financing share
Financing share type | Share | Comments | |
---|---|---|---|
Policy, general governance and design targets
Part of wider plan
0
Policy target
Target purpose |
---|
Policy pressure
Pressure directive | Relevant pressure |
---|---|
Policy area
Policy area type | Policy area focus | Name | Comments |
---|---|---|---|
Policy impact
Impact directive | Relevant impact |
---|---|
Policy wider plan
Wider plan type | Wider plan focus | Name | Comments |
---|---|---|---|
Policy requirement directive
Requirement directive | Specification |
---|---|
Photo gallery