Year of Issue
2024
National Id
PL_04
Site name
Upper Zglowiaczka River Basin
Summary
The case study is located in the north central Poland, in Kuyavian-Pomeranian province. The catchment area is about 150 km2. Due to highly fertile soils, arable land prevails (nearly 90%) in the catchment. The main crops are cereals, maize, oilseed rape, sugar beet, alfalfa, vegetables and herbal crops. An area covered by catch crops is increasing. Share of irrigated crops is small. The catchment is coping with an increasing water deficit for crop production and high nitrate loads and concentrations in water. These problems are amplified by low precipitation (annual average equals to 500 mm being the lowest in the country, 300 mm in the growing season) and the extensive drainage system (open ditches and subsurface tiles) that drains water excess in wet periods.

The OPTAIN project will support the case study team with identifying and developing efficient land management strategies and small technical solutions to improve the soils’ infiltration and water holding capacities as well as its capacity to filter, buffer and transform pollutants.
Project
Optain
Light or indepth?
Light
The in-depth description of the case study
Location description
The Zlowiaczka river basin is located in central Poland, western of Warsaw. The basin is characterized by a strong agricultural presence, with 90% of the land being arable, and only 4% forested.
Transboundary
0
Longitude
19.05471
Latitude
52.65967
Climate zone
cool temperate moist
Mean annual rainfall
300 - 600 mm
Average temperature
8,5
Depth groundwater
less than 5m
Average slope range
flat (0 - 2%) to gentle (3 - 5%)
Monitoring impacts effects
0
Public consultation
0
Contractural arrangements
0
Design contractual arrangement
Arrangement type Responsibility Role Comments Name
Design consultation activity
Activity stage Key issues Name Comments
Design land use change
Land use change type
Design authority
Authority type Role Responsibility Name Comments
Key lessons
Surveys were carried out with stakeholders to better understand barriers and challenges to implementing NWRM in the agricultural sector. Of the 19 informants interviewed, all agreed that policy mechanisms were not adapted to resolving the environmental and water quantity concerns of stakeholders.

The following barriers to NWRM implementation were identified: administrative barriers, voluntary measures, low benefit-cost, complicated implementation, land ownership issues.
Financing mechanism
0
Success factor(s)
Success factor type Success factor role Comments
Financing
Financing type Comments
Barrier
Barrier type Barrier role Comments
Driver
Driver type Driver role Comments
Financing share
Financing share type Share Comments
Part of wider plan
0
Policy target
Target purpose
Policy pressure
Pressure directive Relevant pressure
Policy area
Policy area type Policy area focus Name Comments
Policy impact
Impact directive Relevant impact
Policy wider plan
Wider plan type Wider plan focus Name Comments
Policy requirement directive
Requirement directive Specification