Performance
- Geodetic survey of cross profiles (echolot)
- Laserscanning with drones
- Steel plates are on the bottom of the river in order to measure the transported load in size and volume with ultrasound
- Life space mapping
Design & implementations
Arrangement type | Responsibility | Role | Comments | Name |
---|
Activity stage | Key issues | Name | Comments |
---|---|---|---|
Implementation phase
|
|||
Implementation phase
|
|||
Implementation phase
|
|||
Design phase
|
|||
Other
|
|||
Implementation phase
|
|||
Implementation phase
|
public inaugauration feasts e.g. for the new dam or the different enlarged riverparts
|
||
Implementation phase
|
information day for school children
|
||
Implementation phase
|
tree planting event for children
|
||
Design phase
|
tourism concept, guided routes within the national park
|
||
Other
|
post card showing before after pictures of the drau
|
||
Implementation phase
|
VIP event: Mimi Hughes (marathon swimmer and environmental activist swam through the drau until danube
|
Land use change type |
---|
Authority type | Role | Responsibility | Name | Comments |
---|---|---|---|---|
Lessons, risks, implications...
Success factor type | Success factor role | Comments |
---|---|---|
Attitude of the public
|
main factor
|
Since the revitalization measures on the Drau are a subsequent project to former projects and measures, much less publicity had to be done. The responsibles hadn't to face the fears and worries of farmers and citizens. |
Existing staff and consultant knowledge
|
main factor
|
20 years of experience exist on restoring the river to a more natural state. Moreover, there is good cooperation between the different stakeholders for nature conservation and hydraulic engineering. |
Other
|
secondary factor
|
The regional touristic department supported the measure and furthermore helped to merchandise the Drau project. They looked amongst others at the following questions: How to design picnic areas? Where are the best places for information boards? How can we conduct tourists through the region? |
Attitude of decision makers
|
main factor
|
The purchase of land was combined with a reallocation of land process. Lots were exchanged between farmers. There were a lot of farmers willing to give land for the project and there was also political support of the action. A company constructing/operating hydropower plants had bought lots in the 90s. After their project of building 4 new power plants on the Drau was refused they were nevertheless ready to give their lots to the project partners for a fair price. |
Financing type | Comments |
---|---|
EU-funds: LIFE+
|
1.5 Moi €
|
Sub-national funds
|
Carinthian State Government: 0.2 Million €; Torrent and Avalanche Control: 0.2 Million €
|
National funds
|
Federal Ministry for Agriculture, Forestry, Environment and Water Management 2.7 Mio €
|
Driver type | Driver role | Comments |
---|---|---|
Other
|
main driver
|
Erosion of the river bed was observed (becoming deeper and deeper). There was furthermore a risk that floodplains fall dry and can't operate anymore, as well as a risk of a falling ground water table.
|
Financing share type | Share | Comments | |
---|---|---|---|
Policy, general governance and design targets
Bed load balance shall be achieved. Due to missing pebble supply the Drau river bed became deeper and deeper. Thus the groundwater level decreased, bank stabilization became insecure and flood plains inoperable.
Target purpose |
---|
Runoff control
|
Improved Biodiversity
|
Increase Water Storage
|
Pressure directive | Relevant pressure |
---|
Policy area type | Policy area focus | Name | Comments |
---|
Impact directive | Relevant impact |
---|
Wider plan type | Wider plan focus | Name | Comments |
---|---|---|---|
Catchment-based
|
Water
|
water body-development-concept
|
Plan made in the middle of 90s (93 or 94). Programme for the whole river Drau.
|
Requirement directive | Specification |
---|
Socio-economic
Every few years maintenance has to be done as on every other river like cutting grass or trees.
Number of insect and fish species increased as well. Until mid 2011 28000 km3 were mobilized by the open checked dam and 16000 km3 arrived at the Drau. As consequence the bedload balance could be improved and the riverbed stabilized.