General
National Id
France_04
Site name
Lunéville
Light or indepth?
Light
RBD code
FRB1
Transboundary
0
Data provider
Elia Desmot, OIEau
NWRM(s) implemented in the case study
Longitude
6.502
Latitude
48.589
Site information
Climate zone
cool temperate moist
Mean rainfall
70
Mean rainfall unit
mm/year
Average temperature
10
Type
Case Study Info
Monitoring maintenance
Monitoring impacts effects
1
Monitoring parameters
Hydromorphology, Biological communities (ecology), fauna, flora
Performance
Performance impact estimation method
Catchment outlet
Performance impact estimation information
Species present before and after implementation, decrease of flood impacts
Design & implementations
Application scale
River
Installation date
2007
Lifespan
100
Age
7
Performance timescale
< 1 year
Favourable preconditions
The scheme was made possible by a desire for integrated water management.
Design contractual arrangement
Arrangement type | Responsibility | Role | Comments | Name |
---|
Design consultation activity
Activity stage | Key issues | Name | Comments |
---|
Design land use change
Land use change type |
---|
Design authority
Authority type | Role | Responsibility | Name | Comments |
---|---|---|---|---|
Lessons, risks, implications...
Key lessons
The Vezouze river had a part of its floodplain restored to tackle flood events in a sustainable way and to favour water retention. Flood events are regular and often have bad consequences for the city nearby named Lunéville. The monitoring of the project shows that the improvement of biodiversity, as well as flood impacts decrease, are very satisfactory. Working on multi-thematic issues was a great motivation for policy-makers, as it allowed answering flood protection and security demands, and creating amenity spaces.
Success factor(s)
Success factor type | Success factor role | Comments |
---|---|---|
Attitude of relevant stakeholders
|
main factor
|
|
Attitude of the public
|
secondary factor
|
|
Existing technical standards
|
secondary factor
|
|
Existing institutional framework
|
secondary factor
|
|
Financing possibilities
|
main factor
|
Financing
Financing type | Comments |
---|---|
Local funds
|
Driver
Driver type | Driver role | Comments |
---|---|---|
Past flooding events
|
main driver
|
Financing share
Financing share type | Share | Comments |
---|
Policy, general governance and design targets
Policy description
Flood events, security
Part of wider plan
0
Policy target
Target purpose |
---|
Increase Water Storage
|
Improved Biodiversity
|
Oher Societal Benefits
|
Policy pressure
Pressure directive | Relevant pressure |
---|
Policy area
Policy area type | Policy area focus | Name | Comments |
---|
Policy impact
Impact directive | Relevant impact |
---|
Policy wider plan
Wider plan type | Wider plan focus | Name | Comments |
---|
Policy requirement directive
Requirement directive | Specification |
---|
Socio-economic
Costs investment
230000
Costs investment information
Studies and land acquisition
Costs operation maintenance
1700000
Costs operation maintenance
operation work
Costs total
1930000
Ecosystem improved biodiversity
1
Information on Ecosystem improved biodiversity
Several noticeable species have been observed after implementation of the measure (flora and fauna) that did not exist before.
Ecosystem provisioning services
1
Information on Ecosystem provisioning services
Flood protection
Ecosystem impact climate regulation
No specific impact
Information on Ecosystem impact climate regulation
Not mentioned
Biophysical impacts
Information on retained water
No info
Information on increased water storage
No info
Information on runoff reduction
No info
Water quality overall improvements
N/A info
Soil quality overall soil improvements
N/A info
Information on Soil quality overall soil improvements
Biodiversity enhanced