National Id
Romania_ 10
Site name
Calarasi- Braila
Summary
The objective is the improvement of the navigation conditions on the Danube between Calarasi and Braila, in Romania, by ensuring the minimum depths of 2.5 m of the fairway recommended by the Danube Commission during the entire year, including the dry season.
Light or indepth?
Light
NUTS Code
Sud-Est
RBD code
RO1000
Transboundary
0
Data provider
Bogdan Barbu, REC RomaniaImola Koszta, REC
NWRM(s) implemented in the case study
Longitude
27.566
Latitude
44.1916
Climate zone
warm temperate moist
Type
Case Study Info
Groundwater level
1,39999997615814
Administrative annual cost information
7197680euro: Total monitoring contract in 3 phases
Application scale
Field Scale
Installation date
2014
Size
200
Size unit
km
Public consultation
1
Design contractual arrangement
Arrangement type Responsibility Role Comments Name
Design consultation activity
Activity stage Key issues Name Comments
Design land use change
Land use change type
Design authority
Authority type Role Responsibility Name Comments
Other
Other
Ministry of Transport and Infrastructure
contracting authority
Implementation
INTERCONSTRUCT Ltd.
Implementation
CANAL SERVICE
Ltd.
Implementation
SUPERQUATRO GRUP Ltd
Implementation
GandG Ltd
Other
River Administration of the Lower Danube
beneficiary
Key lessons
Transport of goods on the river is nowadays a very important lifeline for many businesses and an economic way to do it.
For this reason we need to ensure sufficient navigation depth for vessels from the upper navigation
depth for vessels from the upper Danube to Constanta.
Over the years the natural river developments have increased the depth of the Bala branch,
while the Old Danube has become shallower.
Transport of goods on the river is nowadays a very important lifeline for many businesses and an economic way to do it.
For this reason we need to ensure sufficient navigation depth for vessels from the upper navigation
depth for vessels from the upper Danube to Constanta.
Over the years the natural river developments have increased the depth of the Bala branch,
while the Old Danube has become shallower.
Success factor(s)
Success factor type Success factor role Comments
Financing possibilities
main factor
Financing
Financing type Comments
EU-funds: Cohesion and regional development funds
National funds
Barrier
Barrier type Barrier role Comments
Driver
Driver type Driver role Comments
Financing share
Financing share type Share Comments
European funds
85
National funds
15
Policy target
Target purpose
Oher Societal Benefits
Policy pressure
Pressure directive Relevant pressure
Policy area
Policy area type Policy area focus Name Comments
Policy impact
Impact directive Relevant impact
Policy wider plan
Wider plan type Wider plan focus Name Comments
Policy requirement directive
Requirement directive Specification
Costs total
38671752