Abstract
In the vicinity of Lent the existing dike is moved land inwards and in this new area a new trench is dug. This will widen the river bend between Nijmegen and Lent and will assure better water flow off during high tide situations. The estimated drop in water levels in extreme situation is up to 35 cm.
Case study(ies)
Source type
Website