Abstract
The innovative ecoremediation (ERM) system for treatment of the polluted tributary of GlinšÄica was therefore installed in 2006, the ERM system consists of the sedimentation pond for the deposition of coarse particles and reduction of current flow velocity, a vegetated ditch filled with different mixtures of sand, planted with common reed (Phragmites australis) for the aerobic) “ anaerobic treatment and a meandered revitalized stream bed of the tributary for the additional treatment.
Publisher
ECRR
Case study(ies)
Source type
Project Report