Abstract
The most important actions are: transformation of 61 ha of former wastewater basins into a semi-natural wetland as a stopover site for migrating birds (Ormoz Basins); establishment of a grazing system; removal of illegally built fishing and hunting platforms; creation of a new artificial breeding island; opening up and restoration of three side arms of the Drava River (total length of 1.5 km)
Publisher
LIFE Programme
Case study(ies)
Source type
Project Report