Skip to main content
Toggle menu
NWRM
NWRM per sector
Access by benefits
Case studies
Case studies
Sources
Benefit tables
Glossary
About the project & Resources
History of the project
Historical partners
Project documents
data & Inspire
Search
Project Description
2011
>> Read more
Le jardin des eaux à Fourqueux, un projet de parc et une gestion de l’eau à l’échelle du centre-ville
2016
>> Read more
Lower Prut Floodplain - Ecological restoration of the Lower Prut Floodplain Natural Park
>> Read more
The Salt of Life
2012
>> Read more
River Quaggy at Sutcliffe Park:Techniques: Re-meandering, backwater creation, de-culverting
>> Read more
A bivaly-rehabilitácios területek elemzése a Nagyszéksos-To és a Tanaszi-semlyék eltérÅ‘ biotopjain
2013
>> Read more
Restoring ecosystem functions in heavily disturbed estuary
>> Read more
Making space for Water in the Bodrog River Basin (SK-UA-HU)
2009
>> Read more
Conjunctive use of the Germasogeia Riverbed Aquifer and Germasogeia Dam for water supply
2012
>> Read more
Telephone -Interview with PhD Josef Rosner
2014
>> Read more
Bruno Boz was actively involved in the design and implementation of these measures, as well as the other applications implemented by the Consorzio
2014
>> Read more
Guide to Sur - Restoration of Water Regime in National Nature Reserve Sur
>> Read more
Economic aspects of mulch and direct seeding- reduction of soil treatment, which changes in the operational result have to be expected?
2013
>> Read more
Small water reservoirs †“ their function and construction
2012
>> Read more
Life vein-Upper Drau River ; Carinthia†™s largest nature restoration campaign (2006-2011)
2011
>> Read more
LIFE+ Project Mink Territory
>> Read more
Wetlands Restoration - Pollution Reduction GEF Project
>> Read more
a river reborn: Restoring the Quaggy River and tackling flooding
>> Read more
RESTOREWETLANDS - Conservation, restoration and durable management in Small Island of Braila, Romania
>> Read more
Case study:Restore riparian floodplain habitats maintained in reserve "Dolna topchia" and run off on his sleeve "Malka Tundzha"
>> Read more
Green potential of a constructed wetland with reed bed filters on a 172 ha urban project near Reims (France). Project evolution analysis
>> Read more
Das Ackerrandstreifenprogramm
2005
>> Read more
Constructed Wetland in Bulgaria - Constructed Wetland Implementation for On-site Treatment of Domestic Wastewater of a Children´s Home combined with Capacity Building for Professionals
2009
>> Read more
Salmi rannaniidu taastamine, tí¶í¶ nr 13/1136
2013
>> Read more
Natural water retention for combined outcomes - the Arga-Aragon case study (Spain)
2014
>> Read more
Pagination
Previous page
‹‹
Next page
››
sfy39587stp18